







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Kitchen Remodeling: The Los Angeles Owner’s Guide
IKO kitchen remodeling in Los Angeles typically runs $16,520 to $53,100 for a full tear-out and rebuild, with partial upgrades like cabinet or countertop replacement falling between $2,360 and $15,340 depending on scope. We stock IKO-compatible materials across the product line and can match your existing setup, whether you’re replacing a failed cabinet run or redoing the whole kitchen after water damage or wear. Most Los Angeles homeowners discover they need this work when cabinet faces delaminate, drawer glides shear off, or the countertop substrate swells and splits after years of sink-spray exposure.
The good news with IKO products is that parts are standardized enough to match cleanly. The bad news is that a mismatched cabinet depth or wrong hinge boring will show itself the first time you close a door. That’s the difference between a parts order and a kitchen remodel done right.
Which IKO Models This Applies To

IKO manufactures kitchen cabinetry and related millwork across several series lines, and the compatibility question comes down to three things: cabinet box depth, hinge boring pattern, and drawer glide mounting standard. Most IKO cabinets sold in the Los Angeles market over the last 15 years use a standard 24-inch base depth with 12-inch uppers, but we’ve seen enough 21-inch-depth vanity-style boxes in older IKO runs that we measure before we order anything.
Here’s what actually matters on site: the hinge boring. IKO uses a 35mm cup boring on most of its line, which is good news because that’s the European standard. If your doors are drilled for compact 26mm hinges, you’re looking at an older IKO run or a non-standard line. Either way, we match it. On the OEM-versus-aftermarket question, our position is simple: for cabinet boxes and face frames, we source IKO-compatible OEM parts from our documented supplier roster. For hardware, drawer glides, and soft-close mechanisms, we’ll recommend quality aftermarket equivalents like Blum or Grass when they outperform the original at a better price. We’ll show you the difference in writing before we install anything.
We are an independent contractor and not affiliated with IKO. That independence is exactly why we can give you an honest answer about whether a part is worth replacing or whether the cabinet run is done.
Styles & brands we work with







Signs Your IKO Kitchen Remodeling Is Failing
- Cabinet doors drift out of square. The hinge cups have wallowed out or the face frame has shifted. It starts as a door that needs a nudge to close, then becomes a door that won’t stay closed at all.
- Drawer fronts separate from the box. The original fasteners were driven too short at the factory, or the drawer box has absorbed enough moisture to split. Either way, the joint fails and the drawer front sags.
- Countertop seams crack at the sink. The substrate underneath flexes or rots, and the seam opens. In Los Angeles’s dry-wet seasonal swings, caulk joints on laminate countertops fail faster than anywhere else I’ve worked.
- Soft-close mechanisms stop catching. The damper in the glide has blown out. On IKO cabinets, this usually shows up in the bottom drawer first because that’s the one that gets overfilled with pots.
- The toe kick starts separating from the cabinet run. That’s a sign the floor shifted or the original install didn’t account for subfloor variance. It’s not cosmetic. It means the run is no longer bearing correctly.
None of these are reasons to rip out a kitchen blindly. Most IKO failures are isolated: one cabinet, one drawer bank, one section of countertop. We’ll tell you what needs replacing and what doesn’t. That’s how we write scopes.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s the straight number for Los Angeles kitchen remodel work, parts and labor included:
- Full kitchen remodel with IKO-compatible cabinets: $16,520 – $53,100
- Small kitchen remodel: $10,620 – $23,600
- Cabinet installation only: $4,720 – $15,340
- Countertop installation: $2,360 – $7,670
- Backsplash installation: $945 – $2,950
- Kitchen island installation: $3,540 – $11,800
The range exists because a 10-by-10 kitchen with stock IKO boxes runs on the lower end, while a 400-square-foot kitchen with custom panel depth, a peninsula, and stone surfaces runs on the upper end. What’s included: written scope, line-item pricing, all materials, labor, and haul-away. What’s not included: surprises. Our price is written before work starts, and it does not move at the door. When we finish a kitchen, you get a signed copy of the written guarantee in your hand before we roll the last tool cart out. That’s The Garrison Standard.
DIY or Call Us?
Replacing a hinge, adjusting a drawer glide, or tightening a face-frame screw are legitimate homeowner tasks. If the cabinet is square and the hardware is just loose, you can handle that on a Saturday. The line is when the cabinet box itself is compromised or the countertop substrate is involved. Cutting and installing a new countertop on a rotted base is not a DIY job, and neither is re-hanging a bank of uppers that are pulling away from the wall. That’s where you need a crew that knows the difference between a face frame and a substrate, and writes it all down so you’re not guessing.
If you’re in Los Angeles and your IKO kitchen is starting to show its years, call (903) 568-7222. We’ll come out, measure, and give you a written price that covers exactly what needs to happen. No day-of renegotiations, no vague allowances, no six-week radio silence.
FAQs

IKO cabinet boxes and face frames typically last 20 to 30 years in Los Angeles’s mild climate, but the hardware (hinges, glides, soft-close mechanisms) usually fails in years 8 to 12. Most IKO kitchens don’t need a full replacement. They need a hardware and door-front refresh at the decade mark, then a full cabinet run replacement when the boxes themselves start breaking down. If your cabinets are showing face-frame separation, call (903) 568-7222 for a free assessment before you commit to anything.
Yes, in many cases. Hinge cup wallowing, loose face frames, and blown drawer glides are repairable without replacing the box. When the cabinet side panel is split, water-damaged, or the corner joints have opened up, repair becomes a stopgap and replacement is the honest recommendation. We’ll tell you which one applies to your kitchen and give you the written price either way.
A standard IKO kitchen remodel runs 4 to 10 weeks depending on whether we’re doing a full tear-out or a cabinet-and-countertop replacement. Cabinet-only jobs can be done in 3 to 5 days. Countertop-only jobs are usually 1 to 2 days, plus a day for template and fabrication. We sequence demo, rough framing, cabinet set, countertop template, countertop install, and finish work so the job keeps moving. Straight number, real scope, no surprises at the punch list.
Our crews carry the most common IKO-compatible items on the truck: 35mm hinge cups, standard soft-close draw glides, cabinet screws, levelers, and touch-up. For model-specific IKO components, we order from our documented supplier roster and usually have parts in hand within 3 to 7 business days in Los Angeles. We also work with name-brand materials like KraftMaid and Cambria when your IKO kitchen calls for a mixed upgrade. Call (903) 568-7222 and we’ll tell you what’s on hand and what needs to be ordered.
Written by Curtis Lane, Owner, Bradford Remodeling at Bradford Remodeling, serving Los Angeles and nearby areas.


