A new rear addition with a vaulted beamed ceiling and tall windows

ADU rules and requirements - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 22+ years
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled primary suite with built-in wardrobes and a window seat
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled staircase with wood treads and a slim metal railing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

ADU Rules and Requirements

An accessory dwelling unit – a garage conversion, a backyard cottage, a basement apartment – is one of the most regulated residential construction projects you can take on. The rules that govern setbacks, height limits, square footage caps, owner-occupancy requirements, utility connections, and egress standards are set at the local level, which means they vary significantly from one municipality to the next. If you searched this phrase, you are probably trying to figure out what is actually allowed on your property before you spend a dollar.

Call (903) 568-7222

What’s Happening

A finished backyard cottage with a small covered porch

ADU construction is legal in most jurisdictions, but the specific rules – how big the unit can be, how close it can sit to a property line, whether you need to live on-site, how sewer and electrical service must be handled – are set by your local zoning code and building department, not by any national standard. A project that is straightforward in one county can require variances, hearings, or outright redesigns in the next. Getting those details wrong before you break ground is the most expensive mistake an ADU project makes.

Most homeowners run into this topic at one of three moments: they are trying to figure out if an ADU is even possible on their lot, they have started planning and hit a requirement they did not expect, or a permit application came back with conditions attached. All three situations have the same solution – a general contractor who has worked through the permit and zoning process in your specific market and knows where the friction points are.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Why It Happens

Zoning Classification Conflicts

Your property’s zoning designation controls whether an ADU is permitted by right, allowed with conditions, or prohibited entirely. Single-family residential zones, multi-family zones, and mixed-use designations all handle ADUs differently, and some jurisdictions have overlay districts with their own rules stacked on top. If your permit application was denied or your plans came back with a zoning flag, this is the most likely cause – the lot’s classification does not automatically allow what you want to build without additional approvals.

Setback and Lot Coverage Limits

Every parcel has setback requirements – minimum distances the structure must maintain from the front, rear, and side property lines – and a lot coverage cap that limits the total percentage of your lot that can be covered by structures. A detached ADU sitting too close to a fence line, or a project that pushes your combined square footage past the coverage ceiling, will stop the permit review cold. Measuring your existing footprint honestly, before you design anything, is the step most homeowners skip.

Height and Square Footage Restrictions

Many jurisdictions cap ADU height at 16 feet or less for detached units, and cap total floor area anywhere from 500 to 1,200 square feet depending on lot size and local code. Attached ADUs and garage conversions often have their own separate caps. A design that looks right on paper can exceed these limits once actual ridge height or finished floor area is calculated against local definitions – which do not always match the way architects measure.

Utility, Egress, and Life-Safety Requirements

An ADU is a habitable dwelling, which means it must meet the same life-safety standards as the primary home: adequate egress windows or doors, smoke and carbon monoxide detection, proper electrical service, and plumbing that either ties into existing lines or is served by a new connection approved by the utility. Garage conversions frequently fall short on egress and ceiling height. Basement conversions often have issues with natural light and emergency exit dimensions. These are the requirements that surface late in plan review and cause the most costly redesigns.

What to Do Right Now

  • Pull your property’s zoning designation. Your county or municipal assessor’s website usually shows this. Write it down – you will need it in every conversation with a contractor and with the building department.
  • Request the ADU-specific handout from your local building department. Most jurisdictions have published a summary sheet that lists their size limits, setbacks, and permit requirements in plain language. It is free and it saves hours of guesswork.
  • Measure your existing structures and lot lines. Get the total square footage of everything currently built on the lot – house, garage, sheds, covered patios. This tells you how much of your lot coverage allowance is already used.
  • Photograph the space you plan to convert or build on. Interior shots showing ceiling height, existing windows, door locations, and utility panel placement help a contractor give you an accurate assessment without a preliminary site visit.
  • Do not start any construction or demolition before permits are issued. Unpermitted ADU work can result in a stop-work order, forced removal of completed work, and complications when you sell. If someone tells you to “start small and permit later,” walk away.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How We Fix It

When your local Bradford Remodeling team arrives, the first conversation is about what your jurisdiction actually allows – not what you read online. We review your zoning classification, your lot dimensions, and your existing site conditions before we put a single line on paper. From there, we produce a scope of work that is designed to pass plan review the first time: correct setbacks, compliant ceiling heights, proper egress, and utility connections done to code.

Depending on whether you are converting an existing structure or building detached, the work falls under our general contracting service, with kitchen remodeling folded in if the ADU includes a kitchenette. Before any work starts, you receive a written price – no numbers that move once the crew shows up. The 365-Day Done Right Promise covers every completed project: if the work does not hold within that year, we come back and correct it at no charge. Timeline depends on scope, but we give you that estimate in writing too, before anything starts.

Frequently Asked Questions

A wide opening with a new beam where the kitchen wall was removed

Get It Fixed

ADU projects have a lot of moving parts – zoning, permits, structural work, utility connections – and the rules are specific to your market. Your local Bradford Remodeling team knows the process. Call (903) 568-7222 to schedule a free written estimate, or book online. A live person picks up, every time.

Written by Curtis Lane, Owner at Bradford Remodeling, part of the Garrison Partners family since 2004.

What Our Customers Say

★★★★★ 5.0 from 7+ reviews

"Respectful crew. Covered the floors and swept every day."

- Jackie T.

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A wood double vanity with two mirrors after a bathroom remodelAn open living space after a whole-home remodelA remodeled primary bathroom with a soaking tub and walk-in showerA remodeled living room with built-in shelves around the fireplaceAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroom

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · Written quotes before work starts response · free estimates
Call (903) 568-7222

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Los Angeles - we'll get back to you fast. No obligation.

By submitting this form, you confirm you have read our Privacy Policy and authorize us to contact you by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch