5 Mistakes to Avoid With General Contractor
Most homeowners lose money on a remodel not because they hired the wrong general contractor, but because they managed the relationship wrong after signing. The five mistakes below are the ones we see cost Los Angeles homeowners real money: paying on a schedule instead of milestones, letting verbal change orders slide, assuming permits were pulled, releasing final payment too early, and accepting a guarantee that was never put in writing. Fix these five things and you’ve eliminated most of what actually goes wrong on a remodel. If you’d rather skip the homework and work with a contractor who handles all five by default, call Bradford Remodeling at (903) 568-7222.
Mistake #1: Paying on a Time-Based Schedule Instead of Milestones

The deposit check cleared, the demo crew showed up on day one, and everything felt fine. That’s exactly when most general contractor relationships go sideways, because the payment schedule you signed already has the problems built into it. A time-based schedule says you pay 30% at week two, another 30% at week four, and the rest at week eight, regardless of what’s actually been completed. If the crew stalls, you’re still on the hook for checks while the project sits.
A milestone-based schedule ties every payment to something you can walk into the room and verify. Here’s what that looks like in practice on a Los Angeles kitchen remodel:
- Deposit (10 – 20%): Paid at contract signing, covers materials ordering and scheduling.
- Milestone 2 (25 – 30%): Demo complete, rough-in inspection passed, framing done.
- Milestone 3 (25 – 30%): Drywall up, cabinets installed, countertop template cut.
- Milestone 4 (15 – 20%): Plumbing and electrical trim-out complete, flooring down, paint done.
- Final payment (5 – 10%): Punch list signed off, final walkthrough complete, written guarantee in your hand.
Before you sign anything, rewrite the payment schedule yourself. Cross out “week three” and write in “after rough-in inspection passes.” A legitimate contractor won’t fight you on this. The ones who push back are telling you something about how they expect the next few months to go.
At Bradford Remodeling, every contract carries a written price before any work starts and a payment schedule tied to completed milestones, not calendar dates. When we say The Garrison Standard governs the job, that’s part of what we mean: no numbers move at the door, and no check is due until the work behind it is done.
Mistake #2: Letting Verbal Change Orders Stand
Mid-project changes are normal. We’ve never done a Los Angeles remodel where the homeowner didn’t add or adjust something once they saw the space opened up. The mistake isn’t the change. The mistake is letting the general contractor say “we’ll just add that to the final bill” and moving on.
Here’s the specific language to use when your GC asks to do something outside the original scope:
“Write it up as a change order with the price, the materials, and the updated completion date, and I’ll sign it before you start.”
That sentence is your protection. A verbal change order in California is enforceable in some cases, but proving what was agreed to after the fact is a mess. What you want is a written change order that specifies three things:
- The exact scope change: “Extend island by 18 inches, add two drawers, relocate one outlet.”
- The price impact: Fixed dollar amount added to the contract total, not an estimate to be reconciled later.
- The schedule impact: How many additional days this adds to the project, in writing.
If your contractor won’t put a change in writing, stop the work on that item. Not the whole job, just the change. “We can hold off on that until you’ve got a number for me” is a reasonable thing to say to someone working on your home. In our experience, the contractors who resist written change orders are the same ones who show up with a surprise invoice at the end.
Mistake #3: Assuming the General Contractor Pulled the Permit

In Los Angeles, most structural, electrical, plumbing, and HVAC work requires a permit through the Los Angeles Department of Building and Safety, or LADBS. Your general contractor tells you they pulled it. Maybe they did. Maybe they didn’t. And if work starts without one, you’re the one holding the liability, not the contractor.
Here’s how to verify permit status directly. Call LADBS or check the online permit portal for your property address. You can search by address and see every permit pulled in the last several years. If your remodel isn’t listed, the permit wasn’t pulled. If the contractor says “we’ll pull it next week” after demo has already started, that’s a code violation happening on your property.
What to do if you find out work started without a permit:
- Stop the work on anything that requires the permit. Framing, electrical rough-in, plumbing, structural changes.
- Get the permit pulled immediately. A legitimate GC can often expedite this, but the work that’s already done may need to be exposed for inspection.
- Document everything. Photos, dates, and written communication with your contractor before any of it gets covered by drywall.
Permit fees in Los Angeles for residential remodels vary based on the scope, but you should expect the permitting line item on your contract to be specific, not a round number. If your contract just says “permits included” without dollar amounts or permit numbers, ask for the breakdown. A squared-away contractor will show you the actual LADBS fees and their processing time. We pull permits on every project that requires them at General Contractor in Los Angeles level work, and our contracts show homeowners exactly what was paid to the city.
Mistake #4: Releasing Final Payment Before the Punch List Is Signed Off
Here’s the scenario that costs homeowners thousands in Los Angeles every year: the contractor says the job is done, asks for the final check, and promises to “come back next week for those few little things.” The homeowner pays. Next week becomes next month. The phone stops ringing.
The punch list is your contract’s closing mechanism, and it should be treated like a legal document, because it is. A complete punch list before final payment should include:
- Every visible defect written down with a location: “gap under left cabinet toe kick,” “paint drip on hallway wall,” “cabinet door misaligned above refrigerator.”
- A walkthrough together with both parties marking items on the same list, same day.
- A written fix deadline for each item, not “soon.”
- A signed acknowledgment from the contractor that these items are part of the original contract scope.
Only after the punch list items are complete do you release final payment. And “we’ll come back for that” is not a scheduling commitment. It’s a contract problem. Write it down, attach a date, put it in the final change order before final payment, or don’t pay the final installment. This is standard discipline on a properly-run job.
We structure our closes at Bradford Remodeling so the final walkthrough produces a signed punch list, a documented scope, and a written guarantee in the homeowner’s hand before the last check is cut. That’s what “squared away” looks like at job close: clean site, documented scope, written guarantee.
Mistake #5: Accepting a Guarantee That Isn’t in Writing

A contractor’s verbal promise to “stand behind the work” is worth the paper it’s printed on. Which, in this case, is nothing. To be enforceable, a written guarantee must specify three things: what’s covered, for how long, and what the contractor will actually do if the work fails.
A standard contractor warranty in Los Angeles might cover “workmanship defects” for one year, but the language is often vague enough that the contractor can argue about whether a failed seam or a sticking drawer counts. What you want is a written guarantee that says, in plain English:
- The specific work covered: installation labor, materials as supplied, structural work, finishes.
- The duration: one year from completion, or longer if the manufacturer’s warranty on materials extends further.
- The remedy: the contractor returns and corrects the work at no charge within the guarantee period.
Bradford Remodeling’s Done Right Promise is our written guarantee on every completed project. If the work fails inside a full year, we come back and correct it at no charge. That’s the whole guarantee, spelled out in writing before we start, and handed to the homeowner signed at the final walkthrough. We put that promise in place because we’ve been part of the Bradford Remodeling home family since 2012, and we’ve seen too many homeowners accept a handshake when they should have accepted a document.
Most warranties from other remodelers cover labor for 90 days or a year, but they’re written by lawyers looking to limit exposure. The Garrison Standard is the framework behind our guarantee: every price and every promise in writing before a single tool comes out, and a full year of standing behind the work after the last tool leaves.
What a Complete Written Guarantee Should Include
We’ve pulled cabinets out of garages that were installed wrong. We’ve seen warranties that covered “defects” but not the labor to fix them, which is like giving someone a free replacement tire and charging them a thousand dollars to mount it. A complete guarantee needs more than a duration and a promise. Here’s the checklist:
- Scope of the guarantee: Does it cover labor only, or labor and materials? If a cabinet face delaminates, who pays for the replacement door?
- Exclusions that make sense: Normal wear, homeowner-caused damage, acts of God. But nothing vague like “improper use.”
- Transferability: If you sell the house within the guarantee period, does the new owner get the coverage? In a Los Angeles market where homes turn over, this matters.
- The claim process in writing: Who do you call? What’s the response window? A guarantee that says “contact us” without a phone number is a suggestion, not a contract.
When we install Kitchen Remodeling in Los Angeles projects, the materials carry their own manufacturer warranties on top of our Done Right Promise. A Kohler faucet is covered by Kohler’s warranty. The GAF roof we install is covered by GAF. Our guarantee covers our labor and the install, and the manufacturer’s warranty covers the product. That’s a layered protection homeowners rarely see written out clearly, but it’s exactly what should be in your file when the job closes.
The Bottom Line
The five mistakes above share a common thread: they all happen after you’ve already hired someone. You don’t need to be a construction expert to protect yourself. You need a milestone-based payment schedule, written change orders, verified permits, a signed punch list, and a written guarantee. None of those require technical knowledge. They require discipline, and that’s the part homeowners can control.
If you’re in Los Angeles and working through a remodel, or about to start one, Bradford Remodeling offers free estimates with a written price before any work begins. Call Bradford Remodeling at (903) 568-7222 and we’ll walk you through the process, the contract language, and what The Garrison Standard means for your specific job.
Related Services in Los Angeles
When you’re ready to move past planning and into construction, our Home Remodeling in Los Angeles team handles full-home renovations with the same documented price-first approach: written scope, LADBS permits pulled, milestone-based payment schedule, and a signed Done Right Promise at close.
What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Frequently Asked Questions
Check the California Contractors State License Board’s online lookup. Enter the contractor’s name or license number, and the CSLB will show you whether the license is active, whether there are suspensions, and whether any complaints or disciplinary actions have been filed against them. Do this before you sign anything.
Examine whether the request is tied to a written change order that you signed. If it is, the additional cost should match the change order price exactly. If it isn’t, ask for a written change order specifying the price, the scope change, and the schedule impact before you pay anything. Never pay for verbal scope changes.
A one-year written guarantee is the minimum you should accept for labor and installation. At Bradford Remodeling, our Done Right Promise covers every completed project for a full year, and we return to correct failed work at no charge inside that window. Materials carry their own manufacturer warranties on top of that.
Yes. You have the right to stop work if you believe something violates the contract, the building code, or the law. Put the stop-work request in writing, take photos, and keep records. In Los Angeles, if unpermitted work is underway, you can also contact LADBS directly to report it and request an inspection.