







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boral Driveway & Pavers: The Los Angeles Owner’s Guide
If you’re holding a cracked Boral paver or staring at a driveway section that’s settled into a low spot, here’s the straight answer: we match and install Boral-compatible driveway pavers and replacement units throughout Los Angeles, with typical installed pricing running $8,260 to $21,240 depending on square footage and how much substrate has to be rebuilt. We carry common Boral profiles on the truck and can source specific line matches through our supplier network, usually inside three to five business days. Most Los Angeles homeowners discover the problem the same way, a paver cracks under a vehicle load, a section sinks after heavy winter rain, or a tree root finally wins the fight against a border course. You notice it every time you pull into the driveway, and it only gets worse the longer it sits.
What you’re looking at isn’t just a cosmetic issue. In Los Angeles, we deal with expansive clay soils in neighborhoods like Woodland Hills and Encino, plus the constant sun exposure that breaks down polymeric sand joints faster than homeowners expect. A failed Boral driveway paver is a structural problem underneath a surface problem, and the fix has to address both layers.
Which Boral Models This Applies To

Boral’s paver line in the U.S. market runs through several distinct product families, and the compatibility details matter more than most homeowners realize. The main lines we see in Los Angeles are the Boral Clay Paver series (often specified for older Spanish and Mediterranean homes in neighborhoods like Hancock Park and Larchmont), the Boral Concrete Paver line (common in newer developments across the Valley), and the Boral permeable paver system, which shows up on properties where drainage was a permitting requirement. Each line uses different thicknesses, typically 60mm for pedestrian areas and 80mm for vehicle traffic, though clay units can run thinner with the right base preparation.
Here’s the gotcha most people hit: Boral clay pavers and Boral concrete pavers are not interchangeable, even when the face dimensions match. A 4×8 clay paver does not swap cleanly with a 4×8 concrete unit because the surface texture, water absorption rate, and color-fastness under Los Angeles sun are all different. If you’ve got clay, you replace with clay. If you’ve got concrete, you replace with concrete. We’ll match the manufacturer’s code stamped on the underside of a loose paver, or measure and photograph the profile if the stamp is worn. For discontinued Boral lines, which happens more often than anyone in the industry likes to admit, we source close-match equivalents and install them in a blend pattern so the repair doesn’t read as a patch. OEM versus aftermarket matters less for pavers than it does for mechanical parts. What matters is the dimensional match and the material type, and that’s where we do the checking so you don’t have to.
One thing to be clear about: Bradford Remodeling is an independent Los Angeles contractor. We’re not affiliated with Boral, and we don’t claim to be. We work with their products because the material spec is documented and we can stand behind the installation.
Styles & brands we work with







Signs Your Boral Driveway & Pavers Is Failing
- Low spots that hold water after rain. This is almost always a base failure underneath the pavers, not the pavers themselves. Los Angeles clay soil expands and contracts with moisture, and if the original installer skimped on the aggregate base, you’ll see birdbaths form within the first few seasons. The pavers are fine; the substrate underneath is moving.
- Cracked or spalled pavers in the wheel path. Vehicle weight concentrates along the same two tracks every day, and if the bedding layer wasn’t compacted properly, individual pavers take the full point load and crack. We see this constantly in driveways that were originally installed as overlays on old concrete.
- Eroding or sinking border courses along the edges. Edge restraint failure. Without a proper concrete or plastic restraint, the border pavers drift outward over time, the field pavers follow, and the whole installation starts to spread like a deck of cards. Sun-weathered polymeric sand between joints makes this worse.
- Weeds growing through the joints. In Los Angeles, oxalis and spurge will push through any joint sand once the polymer binder breaks down. More than a few weeds means the joint system has failed and water is getting underneath, which starts the freeze-thaw cycle even in our mild climate, though the bigger issue here is soil movement, not ice.
- Visible sand washout after rain. Walk the driveway after a good storm. If you see sandy trails running toward the street or piling up at the low corner, the joint sand is leaving the system. That voids the interlock between pavers, and the next step is shifting and cracking.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a partial Boral paver repair in Los Angeles, targeted section rebuilds with new sand, re-leveled bedding, and replacement pavers typically run $590 to $2,950 depending on how far the base failure extends. A full paver driveway installation, where we’re pulling everything out, rebuilding the base from aggregate up, and reinstalling Boral or Boral-compatible units, runs $8,260 to $21,240. The price spread comes down to three things: total square footage, how much excavation and base material is required, and whether the existing pavers can be salvaged. Clay pavers frequently can be cleaned and reused; concrete pavers that have spalled need to be replaced outright.
Every Bradford Remodeling job includes a written price before any work starts. That’s The Garrison Standard, not a courtesy. You’ll know the cost of materials, labor, base work, and haul-away before we pull a single paver. If the scope changes because we find something underneath that changes the plan, you’ll see the adjusted number in writing and you approve it before we proceed. No numbers that move at the door. And every job is covered by the 365-Day Done Right Promise: if the repair fails within one year, we come back and correct it at no charge. You’ll leave the close-out with a signed written guarantee in your hand.
DIY or Call Us?
Replacing a single Boral paver that’s chipped but still seated properly is a job a careful homeowner can handle. You can lift the unit with a couple of flat bars, reset it in fresh bedding sand, and re-sand the joints. We’ll even tell you which joint sand to buy. But once you’re looking at a low spot, a shifting border, or multiple cracked pavers, the problem is underneath, not on top. That’s where DIY goes wrong. You can patch the surface all you want, but if the base is failing, the patch fails inside a season and you’ve spent your weekend learning why base preparation is the only thing that actually matters. No one gets hurt looking at a sunken paver, only confused about why the fix didn’t hold. Straight number, real scope, no surprises at the punch list. Call (903) 568-7222 and we’ll come look at it.
FAQs

A properly installed Boral paver driveway with a correctly compacted aggregate base will last 25 to 40 years in the Los Angeles climate, with joint sand reapplication every three to five years being the only routine maintenance. The pavers themselves rarely wear out; what fails is the base underneath or the edge restraint system. Call (903) 568-7222 and we’ll tell you which one you’re dealing with.
No, a cracked paver cannot be glued back together in any way that survives vehicle traffic. The correct fix is to remove the damaged unit and install a replacement paver matched to the line and color. If the crack came from a point load on an unsupported area, the bedding underneath gets corrected at the same time so the new paver doesn’t crack the same way. We do this repair as a one-day job in most Los Angeles neighborhoods.
A single-paver replacement runs two to three hours including joint sand. A section rebuild covering a low spot or failed border course typically takes one to two days. A full driveway replacement, with excavation, base rebuild, and reinstallation, runs four to seven days depending on square footage and access. You’ll have a written time estimate before the work is scheduled.
We carry common Boral concrete paver profiles and a selection of clay pavers on our trucks for standard repairs, and we source specific Boral line matches through our supplier network for less common colors and sizes. If your paver is discontinued, we’ll explain the closest compatible match and show you samples before anything goes in. Call (903) 568-7222 with the color and dimensions and we’ll tell you what’s available.
Written by Curtis Lane, Owner, Bradford Remodeling at Bradford Remodeling, serving Los Angeles and nearby areas.


