







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Altadena
A full kitchen remodel in Altadena runs $14,000 – $45,000, and a smaller kitchen update typically lands between $9,000 and $20,000. The spread comes down to one thing: whether your home sits on a raised foundation from the 1920s – 40s, or on a slab from the 1950s or later. That single detail changes the plumbing rough-in, floor leveling, and framing scope before a single cabinet gets ordered. Our team works across Altadena from Lake Avenue up to the foothills, and we know what hides behind the drywall in both eras of construction. Call (903) 568-7222 to get a written scope and price for your specific house.

Key Takeaways:
- Full kitchen remodel in Altadena: $14,000 – $45,000; small kitchen remodel: $9,000 – $20,000.
- Raised-foundation bungalows near Eaton Canyon and below New York Drive routinely need subfloor and framing repair before cabinetry goes in.
- Every Bradford Remodeling project carries the 365-Day Done Right Promise in writing.
- A live person answers the phone 24/7, not a voicemail box.
Why Bradford Remodeling Is Altadena’s Preferred Kitchen Remodeling Company

Bradford Remodeling runs on a documented standard, not a handshake. The Garrison Standard governs how we work across the Garrison Partners family, which has operated since 2004: every price written before work starts, every crew member background-checked and uniformed, and every completed project backed by the 365-Day Done Right Promise. Curtis Lane, who leads our operations, holds every Altadena job to that standard. If the work fails inside the first year, we return and correct it at no charge. That is not a slogan. That is the written guarantee you get in your hand at job close.
Altadena homeowners have dealt with the other kind of contractor: the one who no-shows for the site walk, re-prices at the door, and leaves sawdust in the driveway. We write the scope, the allowances, the brand list, and the price before demolition starts. You know exactly who is walking through your door. You know which cabinet line and countertop surface is specified. You know what the permit set covers and who pulls it.
Our Kitchen Remodeling team works directly in Altadena neighborhoods, from the flat grid west of Lake Avenue to the winding streets up toward Loma Alta Park. That local coverage means the crew who scopes your kitchen is the same crew who builds it, not a rotating cast of subcontractors.
Styles & brands we work with







Kitchen Remodeling Company in Altadena
A kitchen remodeling company doing work in Altadena has to understand the split in this city’s housing stock before quoting anything. Homes built between the 1920s and 1940s, mostly below New York Drive, sit on raised foundations with original wood subfloors. Houses from the 1950s forward, especially as you climb toward the San Gabriel foothills, are mostly slab-on-grade. That one difference dictates how much plumbing relocation is possible, whether floor leveling is required, and what a wall removal actually costs. A written scope has to reflect the house you own, not a generic remodel template.
Cabinets and Countertops
Cabinet installation in Altadena ranges from $4,000 to $13,000, depending on whether you’re doing a full replacement or refacing existing boxes. We specify KraftMaid and Wellborn cabinetry, with Cambria, Caesarstone, and Silestone surfaces specified by name in the contract. Countertop installation runs $2,000 – $6,500, with quartz and granite priced by square foot and edge profile.
Design and Layout
Kitchen design in Altadena’s older homes often comes down to working within a footprint that was never designed for a modern island. Our design process maps the existing rough-in, the load path, and the subfloor condition before we draw the first elevation. That keeps the layout buildable and the price honest.
Small Kitchen Remodel in Altadena
A small kitchen remodel in Altadena generally runs $9,000 – $20,000, and the tight galley footprints in the city’s 1940s-era homes make it one of the most common projects we price. These kitchens often have original plumbing and electrical rough-in that cannot support a larger sink relocation or additional appliance circuit without opening the wall. Planning the remodel around what the rough-in will actually support is what keeps a small-kitchen project from turning into a mid-build change order.
Backsplash and Flooring
Backsplash installation in Altadena costs $800 – $2,500, with tile selection and layout pattern driving the range. Flooring work in older kitchens frequently exposes subfloor that has cupped under the sink run or shifted at the threshold, which is why our written scope includes a subfloor inspection allowance on every raised-foundation home.

Island Installation
Kitchen island installation runs $3,000 – $10,000 in Altadena. On slab homes, adding an island usually means cutting concrete to run new plumbing and electrical, which is a specific line item in our pricing, never a surprise after demo starts. On raised-foundation homes, the island location has to be checked against the joist layout below before the cut list is finalized.
Trusted Brands We Service in Altadena
Our contract specifies materials by name, so you are not buying a generic “premium” label. For Altadena kitchens we install KraftMaid and Wellborn cabinetry, Cambria and Caesarstone quartz surfaces, and Kohler and Moen fixtures. GAF and James Hardie products appear on exterior scopes, and Therma-Tru doors when a kitchen project extends to a side entry. These are documented, traceable brands with manufacturer warranties that sit alongside our own 365-Day Done Right Promise. That matters when something fails two years in and the manufacturer wants the paperwork.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Altadena Homes
- Cupped subfloors under the sink run. In the 1920s – 40s raised-foundation homes below New York Drive, decades of minor leaks warp the original wood subfloor. Cabinetry set on an unleveled floor shims out of square. We sister joists and re-level before the cabinet boxes go in.
- Load-bearing walls where the island needs to go. Foothill-edge homes, especially the 1950s builds up toward Loma Alta Park, often have a structural wall running between kitchen and dining room. Opening it up takes engineering, a beam spec, and a permit. That work gets written into the scope before demo closes.
- Rough-in limits in small galley kitchens. Altadena’s compact 1940s footprints have plumbing and electrical rough-in sized for their era. A sink relocation or double-oven addition triggers a rough-in upgrade that a Pinterest-board estimate never accounted for.
- Slab cuts for island plumbing. Homes above the 1950s line are frequently slab-on-grade. Moving the sink or adding an island means cutting concrete, relocating waste lines, and re-pouring. We quote it as a named line item, not a vague “allowance.”
Pricing for Kitchen Remodeling in Altadena, CA
Here are the ranges we quote in Kitchen Remodeling in Altadena as of this writing. These are actual numbers we put in writing, not a teaser to get a sales call.
| Scope | Altadena Price Range |
|---|---|
| Full Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What moves the number: foundation type, whether a wall comes out, how far the sink relocates, and which cabinet and countertop lines you select. Every estimate is free, and every price is in writing before work starts. Call (903) 568-7222 to have Curtis Lane or one of our project leads walk your kitchen and put a number on paper.
We Also Serve Cities Near Altadena
Our Altadena crews regularly work in Pasadena, La Canada Flintridge, San Marino, and Sierra Madre. The same written pricing, the same 365-Day Done Right Promise, and the same live-person phone coverage apply across the whole Altadena service area. If you’re in a neighboring city, call (903) 568-7222 and ask for the same scope-to-price process.
Serving Altadena, CA - Our Local Coverage Area
We’re a General Contractor in Altadena and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Kitchen Remodeling in Altadena
Yes. Any kitchen remodel in Altadena that moves plumbing, alters electrical, removes walls, or changes the rough-in requires a permit from Los Angeles County, since Altadena is an unincorporated community. We pull the permits, schedule the inspections, and don’t close the job until the final sign-off is in hand. Call (903) 568-7222 and we’ll tell you exactly what your scope triggers before you sign anything.
The wide spread comes from the split housing stock. A slab home with a simple cabinet swap prices at the low end. A 1930s raised-foundation bungalow that needs subfloor repair, structural work, and a full rough-in upgrade lands at the top. Any estimate that doesn’t ask whether your house is raised or slab before quoting isn’t an estimate. Call (903) 568-7222 for a written number based on your actual house.
A cabinet-and-countertop refresh runs three to five weeks. A full gut with structural work, subfloor repair, and moved plumbing runs six to twelve weeks. The structural work on older raised-foundation homes is what stretches the calendar, and it’s also the part you want inspected, not rushed. Call (903) 568-7222 for a schedule tied to your written scope.
In Altadena specifically, it’s the conditions hidden behind the drywall on older homes: rotted subfloor, undersized joists, knob-and-tube wiring, cast-iron waste lines. We build a written allowance for structural and subfloor discovery into every raised-foundation quote, so a cupped floor under the sink is a known line item, not a door-door surprise. Call (903) 568-7222 to see what a properly built scope looks like.
Yes, when the scope is written for what the house actually is. A $9,000 – $20,000 small kitchen remodel in a compact 1940s galley can deliver a functional upgrade without pretending the footprint supports an island it can’t. The key is designing around the existing rough-in and subfloor condition, which is exactly how we build the scope. Call (903) 568-7222 for a free estimate and a written scope for your kitchen on the first visit.
Written by Curtis Lane, Owner at Bradford Remodeling, serving Altadena, CA.










